Job Responsiblities
• Leads all topsides piping activities during construction and integration up to mechanical completion
• Coordinate all piping construction, inspection and testing activities with the Yard
• Manages flange management activities up to mechanical completion
• Provide technical advice and input in the area of construction activities for piping
• Manages the site piping team
• Ensures daily coordination with site QHSE team
• Ensure works are carried out as per schedule, monitors yard manpower.
• Manages the Piping team and sub-contractor at site.
• Coordinate with Piping Teams, sub-contractor and Flange management teams.
• Discuss and seek clarification on design matter with Engineering for piping and coordinate with site QHSE team
• Promote best practice to PMT and contractors at every avenue (meeting, toolbox, discussions, visit, walkabout & etc.) in order to instill the HSE values to each individual.
• Ensure piping works are closely controlled by QAQC
• Ensure the works are carried out as per latest drawings
• Ensure coordination with QAQC and inspections / tests follow the construction schedule
• Reviews/controls all site instructions related to piping or impacting the piping construction
• Signs-off job completion forms
• Leads Mechanical completion (ITRs A) for piping
• Coordinates with other disciplines (mechanical, structure, EIT) to achieve mechanical completion
• Coordinate piping integration works
• Participates in daily VSCC
• Monitors production indicators (manpower, spools fabrication, installation, integration and Testing progress, dia/inch progress, etc.)
• Monitors piping preservation (incl. Exotics)
• Participate in team coordination meetings
• Reports progress for own discipline
• Reports issues and proposes solutions
Job Requirement
Diploma / Degree in Mechanical Engineering
With minimum 8 years’ experience in a lead role for Major FPSO topsides piping
Have taken on a lead role for a minimum of 2 Major FPSO for topsides piping works (min 300,000 dia-inches, which 30% are exotic materials).
Have taken on a lead role for 2 Major FPSO topsides projects, managing fabrication, installation, integration, testing and mechanical completion of entire topsides piping systems.
Good understanding of schedule and resource planning
Fundamental understanding of concepts, principles and practices in the oil and gas Industry.